Fairyhill

A large contemporary extension to a Grade 2 Listed Building.

The objective was to design a dramatic yet affordably buildable curved structure that lightly touches the sensitive listed building. Multiple layers of complex planning/CADW procedure was required to secure the approval.

Project detail

Phase 1 works completed: Spring 2018

Materials: Western red cedar, glass, standing seam metal cladding, render

Main contractor: Bradbar Ltd

Structural Engineer: kPa Consulting Engineers

Historic Buildings Consultant: Moira Lucas

Ecologists: Acer Ecology