No items found.
Fairyhill
A large contemporary extension to a Grade 2 Listed Building.
The objective was to design a dramatic yet affordably buildable curved structure that lightly touches the sensitive listed building. Multiple layers of complex planning/CADW procedure was required to secure the approval.
Project detail
Phase 1 works completed: Spring 2018
Materials: Western red cedar, glass, standing seam metal cladding, render
Main contractor: Bradbar Ltd
Structural Engineer: kPa Consulting Engineers
Historic Buildings Consultant: Moira Lucas
Ecologists: Acer Ecology